Advertisement

We need your help now

Support from readers like you keeps The Journal open.

You are visiting us because we have something you value. Independent, unbiased news that tells the truth. Advertising revenue goes some way to support our mission, but this year it has not been enough.

If you've seen value in our reporting, please contribute what you can, so we can continue to produce accurate and meaningful journalism. For everyone who needs it.

Nasa/PA Images
Florida

Nasa postpones rocket launch to the moon for the second time

The launch was originally planned for 29 August but had to be abandoned moments before lift-off due to issues with an engine.

LAST UPDATE | 3 Sep 2022

NASA HAS POSTPONED its rocket launch to the moon for the second time due to a leak.

The rocket was due to launch at about 7pm Irish time today. The launch was originally due to happen last Monday had to be abandoned moments before lift-off due to a temperature problem in one of the engines.

“The #Artemis I mission to the Moon has been postponed,” Nasa tweeted today.

“Teams attempted to fix an issue related to a leak in the hardware transferring fuel into the rocket, but were unsuccessful.” 

Artemis 1 is the first integrated test of the agency’s Space Launch System (SLS) rocket, Orion spacecraft, and the ground systems at the agency’s Kennedy Space Centre in Florida.

The test is an uncrewed mission around the moon that will pave the way for a crewed, flight test and future human lunar exploration as part of Artemis.

The 322ft (98m) tall Space Launch System (SLS) rocket, which is the world’s most powerful rocket to date, is due to take the Orion capsule, powered by the Airbus-built European Service Module (ESM), into the moon’s orbit.

Screenshot 2022-09-03 08.12.31 PA Graphics / Nasa PA Graphics / Nasa / Nasa

The flight, which will carry mannequins rather than astronauts, marks the next chapter in putting humans back on the moon.

There will be people on board for subsequent missions, with the first crewed flight into space scheduled for 2024.

The UK is part of the Artemis programme, making contributions to the Lunar Gateway – a space station currently in development with the European Space Agency – working alongside the US, Europe, Canada and Japan.

Screenshot 2022-09-03 08.12.21 PA Graphics / Nasa PA Graphics / Nasa / Nasa

Humans last reached the moon some 50 years ago, and the latest mission is about proving people can make longer and more sustainable trips there.

It will also assess whether some infrastructure can be built on and around the moon, allowing humans to survive on another planetary body.

The mission duration is 37 days, 23 hours, 53 minutes and in total it will travel 1.3 million miles.

Author
Press Association
Your Voice
Readers Comments
53
This is YOUR comments community. Stay civil, stay constructive, stay on topic. Please familiarise yourself with our comments policy here before taking part.
Leave a Comment
    Submit a report
    Please help us understand how this comment violates our community guidelines.
    Thank you for the feedback
    Your feedback has been sent to our team for review.

    Leave a commentcancel